Q62: Is the Poplar Street Bridge Structure included within the limit of the project? (as opposed to simply representing the project boundary with no opportunities to annex or co-opt the structures programmatically).

A62: Design parameters of this specificity will be discussed with the Stage III participants at the Stage III Briefing. Also refer to Q/A #57.

Frequently Asked Questions, Stage 1