Q66: Will river front access be provided within the project boundary along the eastern shore from the Eads Bridge to the Malcolm W. Martin Memorial Park? (It looks like this portion might be privately owned by the Casino.)

A66: Design and operational parameters of this specificity will be discussed with the Stage III participants at the Stage III Briefing.

Frequently Asked Questions, Stage 1